Kisen specialize in the contracting of electromechanical equipment installation project, general contracting for construction engineering project, building material manufacturing project, steel structure project, kiln project, hoisting project and so on.
| Mechanical Equipment Installation | |||
| Rotary kiln installation Raw meal vertical mill installation Preheater equipment installation |
Grate Cooler Installation Installation of claimer and stacker Installation of large ESP or bag filler |
Ball Mill Installation Mixer Equipment I |
General mechanical equipment installation Roller type mill installation |
| Electrical and Automation Works | |||
| Electrical cable installation Power transformation and distribution equipment |
Electrical control equipment project Automation gauges installtion project |
Plant area lighting line installation project Plant area lighting and grounding works |
Other electrical equipment works |
| Fabrication and Installation of Non-standard Parts | |||
| Fabrication and Installation of Large Non-standard ducts | Fabrication and installation of small chutes | ||
| Installation Works of Process Pipes | |||
| Water supply and drainage pipe installation | Equipment pneumatic pipe installation | Installation of lubrication oil pipe line | |
| Steel Structure Works | |||
| Fabrication and installation of steel structure | Fabrication and installation of kiln outlet steel structure | Fabrication and installation of platform,ladder and rail | |
| Fabrication and Installation of non-standard Equipment | |||
| Fabrication and installation of preheater and fumace Fabrication and installation of water cooling tower |
Kiln inlet hood fabrication and installation Fabrication and installation of thirdary duct and calciner |
Pulverized coal bin,measuring bin,cyclone | Fabrication and installation of various material bin |
| Sand Blasting and Anti-corrossion Works | |||
| Insulation Works | |||
| ESP filter insulation | Bag filter insulation | Waste gas pipe insulation | Water cooling tower and non-standard pipe insulation |
| Castables Works | |||
| Castable works of preheater | Castable works of rotary kiln | Castable works of grate cooler | Castable works of thirdart air duct and kiln hood |
| Equipment Non-load Test | |||
| Equipment Load Test | |||
| Maintenance and Upgrade of Cement Production Line | |||
| Construction Works | |||
| Industrial Building Works Road and pipe network construction in the plant |
Earth Works | Piling Works | Formwork,rebar,works,concrete works |